
Crypto Briefing·Editorial Team·2d ago
Hut 8 inks $9.8B lease for 352MW at Beacon Point, doubling campus capacity to 704MW
Read original on Crypto BriefingHut 8 signed a $9.8 billion second lease at Beacon Point, doubling the Texas AI campus to 704MW and bringing total contracted capacity to 949MW worth The post Hut 8 inks $9.8B lease for 352MW at Beacon Point, doubling campus capacity to 704MW appeared first on Crypto Briefing.
Discussion · 0
?
💬 Discussion: Hut 8 inks $9.8B lease for 352MW at Beacon Point, doubling campus capacity to 704MW
Hut 8 signed a $9.8 billion second lease at Beacon Point, doubling the Texas AI campus to 704MW and bringing total contracted capacity to 949MW worth The post Hut 8 inks $9.8B lease for 352MW at Beacon Point, doubling campus capacity to 704MW appeared first on Crypto Briefing.
Reply with your take — replies appear on this article and in the main feed. Open thread
